Nov.1959 TOKYO HARDFACING, INC. was independently established, by having been span out from the heat-treatment division of YONEKI WORKS JOINT-STOCK COMPANY.
Sep.1960 The first phase facility construction plan at Tokyo Plant was completed.
Jan.1962 The second phase expansion plan at Tokyo Plant was completed.
Dec.1962 Due to the expanding demands of surface treatment like as Hardfacing, Nitriding, etc. on the machine parts for Petroleum Refinery, Plastic, Iron & Steel, Cement, Shipbuilding, Construction Machinery industries, an integrated manufacturing system including mechanical processing was established.
Jul.1964 A General Sole Agency Contract for Japan of STOODY, the largest maker in U.S.A. of metal surface hardening materials was concluded with TOKYO HARDFACING, INC., where the newest relevant technology being introduced, and set up a large scale nitride furnace as well.
Jun.1968 By using TIG auto-welding machine, a Stellite overlaying automation system was established.
Dec.1971 YUUKI Plant’s the second phase expansion plan was completed.
Feb.1979 A General Sole Agency of CRANE CO.,U.S.A. for Japan was contracted. Sales activity of Special Valve (Slide Valve) for Petroleum Refinery usage started.
Mar.1980 The manufacturing system of Seat Rings for Valves with the capacity of 100,000 pcs. per a month was established.
Dec.1981 YUUKI Plant’s the third phase expansion plan was completed.
Apr.1992 A General Sole Agency Agreement to represent Enpro System, Inc.,U.S.A. covering Asian territories was contracted, and sales activities of the Slide Valve, Butterfly Valve & Plug Valve used for FCC Units began.
Dec.1992 For Vertical Crushing Mill usage, overlay welding technology on the Roller Table Liner was established.
Nov.1998 Our manufactured Rolls for the Hot Strip Mill’s Down Coiler were directly supplied to US STEEL Group, Gary Works in the U.S.A.
Mar.2003 Taiwan Business Office was set up.
Jun.2003 Business transactions of the subordinate materials for Super High Voltage Cables began.
Dec.2005 YUUKI Pant's the fourth phase expansion plan was completed. (Precision Parts Manufacturing Shop was added.)
Jan.2007 The amalgamation of Enpro Systems, Inc. and Tapco International, Inc. having taken place, consequently, TOKYO HARDFACING, INC. contracted as A General Sole Agency Agreement for Japan territory with the TapcoEnpro International, Inc
Apr.2007 A General Sole Agency Agreement to represent DeltaValve, U.S.A. on Unheading Device for Delayed Coker, covering Japan was contracted.
May.2010 TOKYO HARDFACING, INC. achieved the very fist introduction of DeltValve’s Unheading Device into Japanese refinery customer.
Oct.2014 Exhibited at IPF Japan (International Plastic Fair) (1st)
Dec.2014 A General Sole Agency Agreement to represent Bay Plastics Machinery, U.S.A. covering Asian territories was contracted.
Dec.2015 YUUKI Pant's the fifth phase expansion plan was completed. (The 7th factory was complete with the latest equipments.)
Apr.2017 The latest Welding Robot was Introduced.
May.2017 Two fully automatic plasma welding machines were introduced.
Oct.2017 Exhibited at IPF Japan (International Plastic Fair) (2nd)
Nov.2018 Exhibited at METALEX, Thailand Exhibition (1st) (Promoting globalization strategy)
Aug.2019 A General Sole Agency Agreement to represent Accurate Thermal Systems, U.S.A. covering Japanese territory was contracted.
Nov.2019 Exhibited at METALEX, Thailand Exhibition (2nd)